No-dig pipe repair on the Lower North Shore.
Cracked or damaged pipe repaired in place in Cremorne — relining a stack or a shared line without opening walls, slabs or common areas.
No callout fee on eligible jobs · Free quotes
Cremorne is 71.4% apartments across 5,124 dwellings, with interwar walk-ups, post-war blocks and modern developments frequently on the same street. The older buildings are where relining earns its place: an interwar stack that has narrowed over decades is both the most likely to fail and the least suited to repeated aggressive clearing. Lining it restores the bore permanently without opening a riser in an occupied building.

Scale, corrosion and narrowing in interwar cast iron or earthenware stacks, or grease scarring in the modern PVC blocks. The building’s era predicts the finding better than the symptom does.
Because opening up a building is a different order of disruption. This is the part of a drainage repair people do not price until an excavator is already on site.
In the apartment stock, other people’s homes and common areas. Replacing a length of stack means opening the shaft, which affects every lot on that line. On the California Bungalow blocks it is the usual established garden.
A liner goes in through an opening that already exists. Nothing above the pipe has to move.
Ground falling towards Willoughby Bay at around 85 metres across 1.63 square kilometres. Terrain matters less here than tenure — most jobs are decided by what opening a building would involve rather than by what digging the ground would.
Cremorne sits in the North Sydney Council, postcode 2090.
Local figures sourced from: ABS 2021 Census QuickStats — Cremorne (NSW) · Cremorne, New South Wales — Wikipedia
California Bungalows with original pipework on the remaining house blocks, and apartment stacks ranging from interwar cast iron and earthenware through to modern PVC. The older stack material is fragile enough that method has to follow condition.

No trench, no spoil, and nothing above the pipe disturbed. The whole job runs through an existing access point.
The line is inspected end to end so the damage is located and measured. Nothing is quoted from the surface.
Roots are cut out and the pipe wall is jetted back to bare material — a liner will not bond to a coated pipe.
A resin-saturated liner is drawn into position through an existing access point and inflated against the host pipe.
The resin hardens in hours rather than days, forming a new pipe inside the old one with no joints for roots to re-enter.
Any branch lines are cut back open robotically, and a final camera pass confirms the result.
Not every damaged pipe should be relined, and we will say so. These are the cases where it genuinely wins here.
Lining restores bore where cabling only buys weeks.
A liner reinforces the host rather than stressing it.
No riser opened, no lots accessed, no common areas closed.
Relining costs more per metre than excavation. It is usually cheaper overall, and this is why:
| Dig and replace | Relining | |
|---|---|---|
| Excavation | Trench the full length, remove and replace the pipe, backfill | None — the work runs through an existing access point |
| What comes up | Lawn, garden, paving, driveway or slab above the line | Nothing |
| Time on site | Days on a long or deep run | Usually one day for a typical run |
| Reinstatement | Priced separately and often the larger half of the bill | Not applicable |
| Result | New pipe, with joints | A jointless liner inside the host pipe |
| Design life | Depends on material and bedding | 50 years on a correctly installed liner |
The per-metre comparison is the one that misleads. Excavation quotes routinely exclude spoil removal and reinstatement, which is where a dig job gets expensive — and on some properties the reinstatement is simply not possible at any price.
These are typical ranges across the Sydney market — not Voyager’s price list, but a realistic yardstick to judge any quote against, including ours.
| Pipe relining, per lineal metre | $450 – $800 |
| Pipe relining, typical whole job | $4,000 – $10,000 |
| Patch repair, single damaged section | $1,500 – $3,000 |
| Junction reinstatement | $300 – $600 |
| Excavate and replace, per metre | $300 – $600 |
| Driveway reinstatement after a dig job, per sqm | $100 – $200 |
| CCTV drain inspection | $250 – $550 |
| Cutting tree roots from a line | $400 – $1,200 |
Voyager prices by the job, not by the hour, so the number you approve is the number you pay. A camera survey happens before any figure is given — a quote for relining that has not looked down the pipe is a guess.
Most Cremorne properties that ring about relining need a camera first. We will tell you straight — including when clearing the line is the whole job.
A correctly installed liner carries a 50-year design life, and it cures in hours rather than days — so the property is back in normal use the same week rather than the same month.
For an owners corporation the relevant comparison is one authorised job against another decade of reactive callouts on a stack that keeps narrowing.
Roots come back through joints. A liner has none.
Voyager covers the whole Lower North Shore. These are the closest to Cremorne:
No. That is the whole point of it. The liner is drawn in through an existing access point — usually an inspection opening or shaft already on the property — and cured in place against the old pipe. In an occupied block it means no riser shaft opened, no access through lots and no common areas out of service.
Across the Sydney market, relining runs about $450–$800 per lineal metre, with a typical whole job landing between $4,000 and $10,000 and a single-section patch around $1,500–$3,000. Those are market ranges rather than Voyager’s price list. The age and material of the stack. Older pipe needs a gentler approach and a survey first, and coordinating access across an occupied building is usually the critical path.
Per metre, no — excavation is cheaper per metre. Overall it usually is. A dig figure in a building also has to carry access through occupied lots, common areas out of use and works approvals — none of which appear on the per-metre rate. On some properties the reinstatement is not possible at any price, which settles it entirely.
A correctly installed liner carries a 50-year design life. It outlasts what it replaced because it has no joints along its length — and joints are where roots get in, where ground movement opens a gap, and where old earthenware fails first. For an owners corporation that is the relevant number — one authorised job against another decade of reactive callouts on the same line.
A typical residential run is a single day on site, and the resin cures in hours rather than days. Coordinating building access and notifying affected lots usually takes longer than the installation does.
Most can, but not all — and we will say so rather than sell you something that will not work. A pipe that has collapsed completely, or lost so much of its shape that there is nothing left to line against, needs replacing. In Cremorne the host pipe is usually a good candidate: scale, corrosion and narrowing in interwar cast iron or earthenware stacks, or grease scarring in the modern PVC blocks. The building’s era predicts the finding better than the symptom does.
Usually, and it is often the better option precisely because the pipe is old. Cremorne’s strata stock spans interwar walk-ups to modern developments, and an aged cast iron or earthenware stack is both more likely to have narrowed and less tolerant of repeated mechanical clearing. A liner restores the bore and reinforces the host at the same time.
The owners corporation, where the line is common property — which generally means any pipe serving more than one lot. We deal with the strata or building manager directly and provide the camera footage they need to approve the work. Where the line serves only your lot, it is your decision.


Camera survey first, a fixed price agreed before the work starts, and no excavation.
Voyager Plumbing · NSW Contractor Licence 476657C
Verify with NSW Fair Trading
Page reviewed and updated 20 August 2026