No-dig pipe repair on the North Shore.
Cracked or root-damaged pipe repaired in place in Mount Colah: relining works from existing access points, which matters on blocks machinery cannot reach.
No callout fee on eligible jobs · Free quotes
Usually, where the pipe is cracked or root-damaged but still holds its shape. A liner repairs it from the inside, so the garden, driveway and paving above stay put. Voyager’s rates are $450-$800 per metre for a 100mm sewer and $550-$1,000 for 150mm, plus $2,000-$4,000 setup; most whole jobs land at $4,000-$10,000. A camera inspection comes first, and a liner carries a 50-year design life.
Market ranges are a yardstick to judge a quote against, not a quote.

I can rest easy knowing my voyage to the bathroom will be safe and sound thanks to voyager plumbing.
Sam S. September 2025 · Read on Google (review by Sam S.)
Mathew did a great job. He was very professional – good communication, prompt assessment and works, detailed explanations and clear with quote options. Would recommend!
Bridgid R. July 2025 · Read on Google (review by Bridgid R.)
Matt was great .. turned up same day, toilet replaced the next day, sweet!
Leigh A. October 2026 · Read on Google (review by Leigh A.)
No trench, no spoil, and nothing above the pipe disturbed. The whole job runs through an existing access point.
The line is inspected end to end so the damage is located and measured. Nothing is quoted from the surface.
Roots are cut out and the pipe wall is jetted back to bare material: a liner will not bond to a coated pipe.
A resin-saturated liner is drawn into position through an existing access point and inflated against the host pipe.
The resin hardens in hours rather than days, forming a new pipe inside the old one with no joints for roots to re-enter.
Any branch lines are cut back open robotically, and a final camera pass confirms the result.
Mount Colah runs along the ridge north of Hornsby with Ku-ring-gai Chase National Park falling away down its entire eastern side. At 83.9% separate houses most drainage is private line, and the gully-side runs drop steeply away from the street. Reaching a fault part-way down one is what makes an excavation expensive here, not the repair itself.

Relining is priced on the diameter of the pipe and the length of the damaged run, plus a setup charge for getting the equipment on site and preparing the line. These are indicative ranges to judge a quote against, not a quote.
| Pipe relining, 100mm sewer, per lineal metre | $450-$800 |
| Pipe relining, 150mm sewer, per lineal metre | $550-$1,000 |
| Pipe relining, setup and establishment | $2,000-$4,000 |
| Junction reinstatement | $300-$600 |
| Pipe relining, typical whole job | $4,000-$10,000 |
| Driveway reinstatement after a dig job, per sqm | $100-$200 |
| CCTV drain inspection | $250-$550 |
| Cutting tree roots from a line | $400-$1,200 |
Voyager prices by the job, not by the hour, so the number you approve is the number you pay. A camera survey happens before any figure is given: a quote for relining that has not looked down the pipe is a guess.
Mention the offer when you book and we’ll apply it. One offer per job.
$500 off a major drain repair
On drain repairs of $5,000 inc GST or more.
Free CCTV drain inspection
With any paid water jet service, weekdays 7am to 4pm.
$100 off your first job
For new customers.

Most Mount Colah properties that ring about relining need a camera first. We will tell you straight, including when clearing the line is the whole job.
Roots from Ku-ring-gai Chase in pipe on the eastern flank, with the fault usually well down the gully side of the block. The 12.3% unit share brings stack work instead.
Because getting machinery to the fault is the expensive part. This is the part of a drainage repair people do not price until an excavator is already on site.
Established gardens on ridge and gully blocks with national park along the eastern flank, where excavation is constrained.
A liner goes in through an opening that already exists. Nothing above the pipe has to move.
A ridge suburb with the national park falling away to the east and steep gully runs between house and connection.
Mount Colah sits in the Hornsby Shire, postcode 2079.
Local figures sourced from: ABS 2021 Census QuickStats, Mount Colah
Housing and drainage spanning several decades along the rail line: older streets on jointed earthenware, newer development on PVC.

Not every damaged pipe should be relined, and we will say so. These are the cases where it genuinely wins here.
Trench depth climbs quickly down the fall.
Roots recur unless the entry point is sealed.
The survey decides, not the street.
Relining costs more per metre than excavation. It is usually cheaper overall, and this is why:
| Dig and replace | Relining | |
|---|---|---|
| Excavation | Trench the full length, remove and replace the pipe, backfill | None: the work runs through an existing access point |
| What comes up | Lawn, garden, paving, driveway or slab above the line | Nothing |
| Time on site | Days on a long or deep run | Usually one day for a typical run |
| Reinstatement | Priced separately and often the larger half of the bill | Not applicable |
| Result | New pipe, with joints | A jointless liner inside the host pipe |
| Design life | Depends on material and bedding | 50 years on a correctly installed liner |
The per-metre comparison is the one that misleads. Excavation quotes routinely exclude spoil removal and reinstatement, which is where a dig job gets expensive, and on some properties the reinstatement is simply not possible at any price.
A correctly installed liner carries a 50-year design life, and it cures in hours rather than days, so the property is back in normal use the same week rather than the same month.
On a steep gully run a permanent repair avoids ever having to reinstate the same slope twice.
Roots come back through joints. A liner has none.
Voyager covers the whole North Shore. These are the closest to Mount Colah:
No. That is the whole point of it. The liner is drawn in through an existing access point, usually an inspection opening or shaft already on the property, and cured in place against the old pipe. It means no trench cut down a steep gully block and nothing excavated towards the park along the eastern flank.
It depends on the diameter of the pipe and how much of it is damaged. A 100mm sewer runs about $450-$800 per lineal metre and a 150mm line $550-$1,000, plus a setup and establishment charge of $2,000-$4,000 that covers getting the equipment on site and preparing the line. A typical whole job lands between $4,000 and $10,000. Those are indicative ranges, not a quote: every job is priced fixed after a camera inspection. In Mount Colah, the price comes down to how far down the gully the fault sits. Ridge-and-gully ground means steep long runs, and reaching a fault part-way down one is the dominant cost of digging.
Per metre, no: excavation is cheaper per metre. Overall it usually is. The dig figure rarely includes getting plant to the fault and spoil back out, which on constrained blocks is the bulk of the cost. On some properties the reinstatement is not possible at any price, which settles it entirely.
A correctly installed liner carries a 50-year design life. It outlasts what it replaced because it has no joints along its length, and joints are where roots get in, where ground movement opens a gap, and where old earthenware fails first. Which matters most where returning to the property is itself expensive.
A typical residential run is a single day on site, and the resin cures in hours rather than days. On a constrained block, getting equipment into position is the part worth planning; the installation itself is quick.
Most can, but not all, and we will say so rather than sell you something that will not work. A pipe that has collapsed completely, or lost so much of its shape that there is nothing left to line against, needs replacing. In Mount Colah the host pipe is usually a good candidate.
The eastern side, generally. Ku-ring-gai Chase National Park falls away down that whole flank, so properties on it have mature native roots immediately adjacent and steep gully runs between house and connection. The western streets are further from the park and typically less affected.
Through that section, yes. Roots enter at joints and cracks; a liner is continuous and seals them, so the entry point is gone. Roots can still find a different fault further along an old line, which is why the survey covers the whole run rather than only the section that failed.
Per metre it costs more than digging, because the liner, resin and curing equipment cost more than plain pipe. The comparison changes once excavation is counted: digging means trenching, spoil removal and putting the driveway, paving or garden back, and that is where dig jobs get expensive. Voyager’s relining runs $450-$800 per metre for 100mm pipe, plus $2,000-$4,000 setup.
Often, once the cost of digging is included, and especially under a driveway, slab, established garden or tree. On a short, shallow, easily reached run, digging can still be cheaper. A camera inspection of the Mount Colah line shows which side of that line your pipe falls on before you commit to either.
Voyager Plumbing was founded by Mathew Veselcic, a licensed plumber, drainer and gasfitter who has held his own NSW contractor licence since December 2016. He is the nominated supervisor on the company licence that covers the work in Mount Colah, and personally accountable for it.


Camera survey first, a fixed price agreed before the work starts, and no excavation.
Voyager Plumbing · NSW Contractor Licence 476657C
Verify with NSW Fair Trading
Page reviewed and updated 5 November 2026